By Mark Perryman - Platform Specialist

“We have an internal BI team. Can’t they build our Awaab’s Law reporting tool?”

A reasonable question, but “can we build it?” is only the starting point.

The more useful questions are: who will shape it, when will teams be able to rely on it, and will it cover every phase?

The answers matter whether you build internally, buy an established solution or combine the two.

1. Who will design it—and who has time to help?

Imagine an assistant director of repairs managing several teams, competing projects and growing demands for assurance. They need better reporting but have little time to specify it.

Meanwhile, a BI analyst is asked to turn fragmented operational data into a clear compliance picture.

Neither lacks commitment. What is missing is the time and structure to connect operational knowledge with technical delivery. The people who understand the service are stretched, while the people building the reports can often lack sufficient operational input.

The danger is that reporting becomes shaped by the fields available rather than the decisions people need to make.

“How many cases closed last month?” is useful.

“Which households need action today, what is outstanding and who owns the next step?” serves a different purpose.

Before development begins, bring repairs, compliance, customer contact and BI colleagues together. Test the proposed reporting against real cases, including missing contractor updates, repeat reports and incomplete evidence.

An operational lead needs protected time to shape and approve the reporting. Otherwise, the BI team is being asked to make service decisions by default.

2. When will the system become operationally useful?

There is a difference between a working dashboard and reporting that teams can trust.

In a Dynamics 365 environment, Power BI can connect to Dataverse using Microsoft’s supported connector. But choosing between Import and DirectQuery introduces decisions about data freshness, performance and security. A connection is the beginning of the design, not the end.

The harder questions concern what sits behind the visuals.

Does the case link reliably to the property, repairs orders and contractor updates? Are deadlines calculated from the correct events? Can users distinguish missing information from a genuine absence of outstanding work?

Ask for milestones covering:

  • Operational requirements and agreed definitions.

  • Data integration and reconciliation.

  • Deadline calculations and exception handling.

  • Testing against real case histories.

  • Deployment, documentation and ongoing support.

Microsoft 365 can make the finished reporting easier to use. Power BI reports can sit within Teams channels, bringing information into an existing working environment. However, embedding a report does not automatically grant access; permissions still need managing.

If delivery will take months, ask what operational teams will use meanwhile. Apply the same scrutiny to a supplier’s implementation timetable.

3. Will it cover every phase?

There are two meanings of “every phase”.

The first is the regulatory rollout. In England, Awaab’s Law initially covered all emergency hazards and significant damp and mould hazards. Phase 2 begins on 30 November 2026, extending significant-hazard requirements to further categories, with further expansion planned for 2027.

Ask whether the reporting model can accommodate additional hazards and rules without substantial redevelopment, and who will maintain those changes.

The second is the case lifecycle.

Reporting should distinguish investigation, written findings, relevant safety work and subsequent preventative work. These are separate responsibilities, not interchangeable measures of “completion”.

A closed repairs order may tell you that a job has finished. It should not automatically be treated as evidence that every relevant obligation has been met.

Ask to follow one case through the reporting: what was reported, what happened next, what the resident was told, what remains outstanding and where the supporting evidence sits.

That is a stronger test than reviewing a headline compliance percentage.

Compare the whole commitment

Internal development is not free because the team is already employed. The relevant cost includes requirements gathering, integration, testing, maintenance and the work those colleagues cannot undertake while they are building it.

Equally, buying software does not remove the landlord’s responsibilities for data quality, operational ownership or assurance.

Compare both routes over the same period and against the same requirements. Include staff time, implementation, licensing, support, future changes and continuity if key people leave.

Ask how the external licence compares with the fully costed capacity an internal build will consume, not simply whether one budget line looks cheaper.

An internal build can be the right answer where capacity, operational involvement and long-term ownership are in place. An established solution may be stronger where it meets the requirements and avoids rebuilding capability that already exists.

The choice should not be a judgement on your BI team’s ability.

It should be a judgement on which approach gives operational teams useful information soon enough, and keeps that information dependable as the requirements evolve.