A repairs dashboard should answer three questions: are residents getting the service they need, where is performance slipping, and what needs to happen next?
Strong completion figures can sit alongside unresolved repairs, repeat visits and residents chasing updates. Housing associations and local authorities need a connected view of timeliness, outstanding demand, quality, resident experience and cost.
Start with regulatory measures
The Regulator of Social Housing’s Tenant Satisfaction Measures provide a foundation for repairs reporting.
RP02 measures emergency and non-emergency responsive repairs completed within the landlord’s target timescales, reported separately. Measurement runs from when the repair was first brought to the landlord’s attention to completion.
TP02 measures satisfaction with the overall repairs service among respondents who received a repair in the previous 12 months. TP03 measures satisfaction with the time taken to complete their most recent repair.
Operational reporting should build on these measures. The following recommendations are an operational framework, not additional regulatory requirements.
1. Repairs completed within target
Show emergency and non-emergency performance separately, supported by monthly trends, completed-job volumes and breakdowns by repair type, priority and contractor.
If 90% of repairs were completed on time, investigate the remaining 10%: how late were they, and which residents were affected?
Compare landlords cautiously. RP02 uses providers’ own published target timescales, which can differ. A higher percentage does not automatically mean a faster service.
2. End-to-end completion time
Show how long residents actually wait, alongside performance against targets.
Consider the median, average and time within which 90% of completed repairs were delivered. The median shows the middle of the distribution; the average is more affected by long-running jobs.
Separate repair types and priorities, and state whether calculations use hours, calendar days or working days. Retain the prescribed methodology for regulatory reporting.
3. Outstanding repairs and WIP
WIP reporting shows what still needs attention. Distinguish all outstanding work from repairs that have exceeded their target.
Include:
Total open and overdue repairs.
Jobs approaching their target date.
Age of outstanding work.
Jobs awaiting appointments, materials, access or follow-on work.
Break these down by trade, priority and contractor. Age alone should not determine priority: a recent safety issue may need attention before an older routine repair. Make the next action and its owner visible.
4. Forecast demand and capacity
Include a forward-looking view: where could demand exceed capacity, and what might that mean for waiting times?
Predictive modelling can explore future repairs demand, while scenario modelling tests how changes in workload or resources could affect delivery.
Useful views include forecast demand against capacity, projected backlog trends and scenarios involving additional resources or higher demand.
Present forecasts as estimates with clear assumptions, not guaranteed outcomes, to support earlier intervention and better planning.
5. First-time completion and duplicates
A quickly completed repair may still represent a poor outcome if it requires avoidable repeat visits.
Define how inspections, planned multi-visit work, follow-on jobs and reopened repairs are treated. Agree the period used to identify repeats.
Matching by address alone is insufficient because residents may report unrelated repairs. Where possible, connect the property, location, repair category and underlying issue.
Reporting should help teams investigate whether interventions address the cause, rather than repeatedly treating symptoms.
6. Appointment reliability
On-time completion does not reveal missed appointments or repeated rearrangements.
Track appointments kept, missed visits, rearrangements, no-access outcomes and repairs awaiting an appointment.
Keep reasons distinct: a resident-requested change, operative absence and unsuccessful access attempt require different responses.
Repeated access difficulties should prompt a review of communication and appointment arrangements, rather than simply generate another failed-visit record.
7. Resident satisfaction and repeat contact
Test operational performance against residents’ experience through post-repair feedback, complaints, repeat contact and whether residents believe the issue is resolved.
Keep sources clearly labelled. A post-repair survey is not interchangeable with the regulator’s TP02 and TP03 measures.
Show response volumes alongside percentages. Investigate conflicting results: a repair can meet its target while involving poor communication, inconvenient appointments or an unsatisfactory outcome.
8. Cost and financial performance
Connect delivery with the resources used to achieve it.
Track cost per completed repair, expenditure against budget, costs by repair type or contractor, and repeat-visit costs.
Define whether calculations include labour, materials, subcontractors, overheads and accruals. Ensure expenditure relates to the repairs counted.
Read cost alongside quality and timeliness. A lower average cost is not automatically an improvement; job mix or outcomes may explain it.
9. Hazard-related repairs and actions
Keep safety-related work visible through risk classifications, applicable deadlines, outstanding investigations, remedial actions and escalation ownership. Connect repair orders with the wider hazard-case record.
Distinguish repairs performance from legal compliance monitoring. RP02 measures end-to-end repair completion, whereas Awaab’s Law involves multiple applicable timescales. A completion KPI alone cannot establish compliance.
Teams should be able to move from a headline exception to case details and identify the next action.
Make every KPI actionable
Different users need different views. Boards need trends, resident outcomes, risks and financial oversight. Service managers need demand, backlog and contractor analysis. Operational teams need jobs requiring action and unresolved dependencies.
Document each KPI’s calculation, owner, source, refresh frequency and exclusions. Make data-quality issues visible rather than allowing missing dates or unmatched records to distort results.
Connect the overall picture with the detail
A useful dashboard shows where residents are waiting, why work is delayed and whether interventions are working.
iLumen8 brings information from existing systems into connected reporting views. Its repairs monitoring, configurable dashboards, drill-down analysis and cross-service reporting connect headline performance with the detail behind it.
The priority is not how many KPIs appear on screen, but whether they help people make better decisions.
Contact us today to explore how iLumen8 can help your organisation build a clearer view of repairs performance.





